The Hard Rock Hotel set the trend of the upscale resort for the new Las Vegas demographic. In addition to providing the base engineering for the hotel and casino, FEA provided the engineering for the various venues including the “shoulder to shoulder” venues such at The Joint and Baby’s. Attention to the high-tech finishes in these areas required ultimate engineering component integration. Total Construction Cost: $350 Million (Yr. 2001 dollars) Mechanical Construction Cost: $30 Million

  • Hard Rock Hotel

  • Las Vegas, Nevada

 

"An important work of architecture will create polemics"

- Richard Meier